precision_manufacturingTurnkey Configured Water Plant Solution

Cooling Tower Blowdown Softening & RO Reclamation Plant (4,000 m³/day)

Engineered turnkey configured solution designed for Industrial Water Reuse & Recycling. Standardizes delivery of high-purity product water while maximizing energy efficiency and operational reliability via pre-fabricated skids.

scheduleLead Time: ~16 Weeks DeliveryverifiedTurnkey Commissioning IncludedhubISO 9001 / ASME Standard
Quick Sizing Benchmark
Indicative Budget:$1.4M – $2.1M FOB
upload_fileUpload Existing Project BOQ

analyticsGuaranteed Operational Outcomes & Performance Limits

Capacity Range2,000 - 8,000 m³/day ContinuousModular scalability
Delivery Timeline~16 WeeksFactory dispatch
Process IntegrationPre-tested Plug & PlayStandardized skids
Target AssetThermal Power Plants, Data Centers, District Cooling Networks & Steel MillsCustomized baseline

view_moduleIncluded Modular Process Skids (5)

Fully skid-mounted and pre-piped in ISO containers
01

Chemical Softener Clarifier

Factory integrated skid assembly (Stage 01) with instrumentation & PLC controls

checkFAT Tested in Factory
02

Multimedia Sand/GAC Filters

Factory integrated skid assembly (Stage 02) with instrumentation & PLC controls

checkFAT Tested in Factory
03

Low-Fouling RO Racks

Factory integrated skid assembly (Stage 03) with instrumentation & PLC controls

checkFAT Tested in Factory
04

Antiscalant Dosing Systems

Factory integrated skid assembly (Stage 04) with instrumentation & PLC controls

checkFAT Tested in Factory
05

SCADA Plant Telemetry

Factory integrated skid assembly (Stage 05) with instrumentation & PLC controls

checkFAT Tested in Factory

constructionIncluded Turnkey Engineering & Commissioning Scope

check_circleSilica & Hardness Precipitation Kinetics Modeling
check_circleOn-Site Commissioning
check_circlePlant Water Balance Optimization Audit

playlist_add_checkEngineering Design Assumptions

  • Customer supplies concrete foundation slab and raw feed water connection.
  • Customer supplies 400V / 3-phase / 50-60Hz electrical power boundary point.
  • Raw water conditions comply with specified design envelope TDS limits.

warningExplicit Battery Limit Exclusions

  • Off-site raw water intake civil structures and long-distance conveyance piping.
  • Local environmental permit filing fees (technical dossier supplied by HydroPonds).