precision_manufacturingTurnkey Configured Water Plant Solution
Turnkey Surface Drinking Water Clarification Plant (25,000 m³/day)
Engineered turnkey configured solution designed for Drinking Water Purification. Standardizes delivery of high-purity product water while maximizing energy efficiency and operational reliability via pre-fabricated skids.
scheduleLead Time: ~20 Weeks DeliveryverifiedTurnkey Commissioning IncludedhubISO 9001 / ASME Standard
analyticsGuaranteed Operational Outcomes & Performance Limits
Capacity Range15,000 - 50,000 m³/day TurnkeyModular scalability
Delivery Timeline~20 WeeksFactory dispatch
Process IntegrationPre-tested Plug & PlayStandardized skids
Target AssetRegional Water Boards, River Intake Stations & City UtilitiesCustomized baseline
view_moduleIncluded Modular Process Skids (5)
Fully skid-mounted and pre-piped in ISO containers01
Rapid Flash Mixing Chamber
Factory integrated skid assembly (Stage 01) with instrumentation & PLC controls
checkFAT Tested in Factory
02
Lamella Tube Settlers
Factory integrated skid assembly (Stage 02) with instrumentation & PLC controls
checkFAT Tested in Factory
03
Dual Media Pressure Filters
Factory integrated skid assembly (Stage 03) with instrumentation & PLC controls
checkFAT Tested in Factory
04
Chlorine Dioxide & UV Disinfection Stage
Factory integrated skid assembly (Stage 04) with instrumentation & PLC controls
checkFAT Tested in Factory
05
Sludge Thickening Sump
Factory integrated skid assembly (Stage 05) with instrumentation & PLC controls
checkFAT Tested in Factory
constructionIncluded Turnkey Engineering & Commissioning Scope
check_circleRaw Water Seasonal Jar Testing Analysis
check_circleCommissioning Protocol Execution
check_circleWHO Drinking Water Guidelines Compliance Audit
playlist_add_checkEngineering Design Assumptions
- Customer supplies concrete foundation slab and raw feed water connection.
- Customer supplies 400V / 3-phase / 50-60Hz electrical power boundary point.
- Raw water conditions comply with specified design envelope TDS limits.
warningExplicit Battery Limit Exclusions
- Off-site raw water intake civil structures and long-distance conveyance piping.
- Local environmental permit filing fees (technical dossier supplied by HydroPonds).
