|Knowledge|emergencyEmergency Water & WASH|Sign InCreate Account
Home/Marketplace/Solutions/Configured SWRO Plant
precision_manufacturingTurnkey Configured Water Plant Solution

Emergency Rapid-Deployment WASH Potable Water Purification Skids (150 m³/day)

Engineered turnkey configured solution designed for Emergency Water & WASH Humanitarian Relief. Standardizes delivery of high-purity product water while maximizing energy efficiency and operational reliability via pre-fabricated skids.

scheduleLead Time: ~2 Weeks DeliveryverifiedTurnkey Commissioning IncludedhubISO 9001 / ASME Standard
Quick Sizing Benchmark
Indicative Budget:$1.4M – $2.1M FOB
upload_fileUpload Existing Project BOQ

analyticsGuaranteed Operational Outcomes & Performance Limits

Capacity Range50 - 300 m³/day Air-TransportableModular scalability
Delivery Timeline~2 WeeksFactory dispatch
Process IntegrationPre-tested Plug & PlayStandardized skids
Target AssetDisaster Relief Agencies, Red Cross / Red Crescent, Military & Municipal Water TriageCustomized baseline

view_moduleIncluded Modular Process Skids (5)

Fully skid-mounted and pre-piped in ISO containers
01

Heavy-Duty Transport Aluminum Skid

Factory integrated skid assembly (Stage 01) with instrumentation & PLC controls

checkFAT Tested in Factory
02

Intake Submersible Floating Pump

Factory integrated skid assembly (Stage 02) with instrumentation & PLC controls

checkFAT Tested in Factory
03

Dual Cartridge Filters

Factory integrated skid assembly (Stage 03) with instrumentation & PLC controls

checkFAT Tested in Factory
04

RO Demineralizer

Factory integrated skid assembly (Stage 04) with instrumentation & PLC controls

checkFAT Tested in Factory
05

Automated Chlorinator

Factory integrated skid assembly (Stage 05) with instrumentation & PLC controls

checkFAT Tested in Factory

constructionIncluded Turnkey Engineering & Commissioning Scope

check_circleRapid 24-Hour Factory Dispatch Guarantee
check_circleField Maintenance Spare Parts Crate
check_circleBilingual Field Deployment Manuals

playlist_add_checkEngineering Design Assumptions

  • Customer supplies concrete foundation slab and raw feed water connection.
  • Customer supplies 400V / 3-phase / 50-60Hz electrical power boundary point.
  • Raw water conditions comply with specified design envelope TDS limits.

warningExplicit Battery Limit Exclusions

  • Off-site raw water intake civil structures and long-distance conveyance piping.
  • Local environmental permit filing fees (technical dossier supplied by HydroPonds).