|Knowledge|emergencyEmergency Water & WASH|Sign InCreate Account
Home/Marketplace/Solutions/Configured SWRO Plant
precision_manufacturingTurnkey Configured Water Plant Solution

Landfill Leachate High-Pressure Disc Tube RO (DTRO) Mobile Plant (250 m³/day)

Engineered turnkey configured solution designed for Hazardous Leachate & Environmental Remediation. Standardizes delivery of high-purity product water while maximizing energy efficiency and operational reliability via pre-fabricated skids.

scheduleLead Time: ~10 Weeks DeliveryverifiedTurnkey Commissioning IncludedhubISO 9001 / ASME Standard
Quick Sizing Benchmark
Indicative Budget:$1.4M – $2.1M FOB
upload_fileUpload Existing Project BOQ

analyticsGuaranteed Operational Outcomes & Performance Limits

Capacity Range100 - 500 m³/day High-RecoveryModular scalability
Delivery Timeline~10 WeeksFactory dispatch
Process IntegrationPre-tested Plug & PlayStandardized skids
Target AssetMunicipal Waste Facilities, Remediation Sites & Hazardous Waste RepositoriesCustomized baseline

view_moduleIncluded Modular Process Skids (4)

Fully skid-mounted and pre-piped in ISO containers
01

Sand Pre-Filter

Factory integrated skid assembly (Stage 01) with instrumentation & PLC controls

checkFAT Tested in Factory
02

DTRO High-Pressure Tube Modules

Factory integrated skid assembly (Stage 02) with instrumentation & PLC controls

checkFAT Tested in Factory
03

Chemical CIP & Flush Skid

Factory integrated skid assembly (Stage 03) with instrumentation & PLC controls

checkFAT Tested in Factory
04

Containerized Enclosure with Climate Control

Factory integrated skid assembly (Stage 04) with instrumentation & PLC controls

checkFAT Tested in Factory

constructionIncluded Turnkey Engineering & Commissioning Scope

check_circleTOC and Heavy Metal Removal Validation
check_circleAutomated Remote Telemetry Dispatch
check_circleOperator Certification & Safety Training

playlist_add_checkEngineering Design Assumptions

  • Customer supplies concrete foundation slab and raw feed water connection.
  • Customer supplies 400V / 3-phase / 50-60Hz electrical power boundary point.
  • Raw water conditions comply with specified design envelope TDS limits.

warningExplicit Battery Limit Exclusions

  • Off-site raw water intake civil structures and long-distance conveyance piping.
  • Local environmental permit filing fees (technical dossier supplied by HydroPonds).