Home/Marketplace/Solutions/Configured SWRO Plant
precision_manufacturingTurnkey Configured Water Plant Solution

Produced Water De-Oiling & Heavy Metals Treatment Plant (8,000 m³/day)

Engineered turnkey configured solution designed for Produced Water & Oilfield Environmental. Standardizes delivery of high-purity product water while maximizing energy efficiency and operational reliability via pre-fabricated skids.

scheduleLead Time: ~18 Weeks DeliveryverifiedTurnkey Commissioning IncludedhubISO 9001 / ASME Standard
Quick Sizing Benchmark
Indicative Budget:$1.4M – $2.1M FOB
upload_fileUpload Existing Project BOQ

analyticsGuaranteed Operational Outcomes & Performance Limits

Capacity Range4,000 - 16,000 m³/day IndustrialModular scalability
Delivery Timeline~18 WeeksFactory dispatch
Process IntegrationPre-tested Plug & PlayStandardized skids
Target AssetUpstream Oil & Gas Operators, Petrochemical Terminals & Offshore PlatformsCustomized baseline

view_moduleIncluded Modular Process Skids (4)

Fully skid-mounted and pre-piped in ISO containers
01

Skim Tank Coalescing Media Pack

Factory integrated skid assembly (Stage 01) with instrumentation & PLC controls

checkFAT Tested in Factory
02

High-Efficiency Gas Flotation Cell

Factory integrated skid assembly (Stage 02) with instrumentation & PLC controls

checkFAT Tested in Factory
03

Ceramic Tubular Membranes

Factory integrated skid assembly (Stage 03) with instrumentation & PLC controls

checkFAT Tested in Factory
04

Chemical Demulsifier Injection Rack

Factory integrated skid assembly (Stage 04) with instrumentation & PLC controls

checkFAT Tested in Factory

constructionIncluded Turnkey Engineering & Commissioning Scope

check_circleFree & Emulsified Hydrocarbon Profiling
check_circleExplosion-Proof ATEX Engineering Verification
check_circleDischarge/Re-injection Permitting Submittals

playlist_add_checkEngineering Design Assumptions

  • Customer supplies concrete foundation slab and raw feed water connection.
  • Customer supplies 400V / 3-phase / 50-60Hz electrical power boundary point.
  • Raw water conditions comply with specified design envelope TDS limits.

warningExplicit Battery Limit Exclusions

  • Off-site raw water intake civil structures and long-distance conveyance piping.
  • Local environmental permit filing fees (technical dossier supplied by HydroPonds).