|Knowledge|emergencyEmergency Water & WASH|Sign InCreate Account
Home/Marketplace/Solutions/Configured SWRO Plant
precision_manufacturingTurnkey Configured Water Plant Solution

Zero Liquid Discharge (ZLD) Brine Concentration & Crystallizer Skid (500 m³/day)

Engineered turnkey configured solution designed for Industrial ZLD & Circular Brine Mining. Standardizes delivery of high-purity product water while maximizing energy efficiency and operational reliability via pre-fabricated skids.

scheduleLead Time: ~22 Weeks DeliveryverifiedTurnkey Commissioning IncludedhubISO 9001 / ASME Standard
Quick Sizing Benchmark
Indicative Budget:$1.4M – $2.1M FOB
upload_fileUpload Existing Project BOQ

analyticsGuaranteed Operational Outcomes & Performance Limits

Capacity Range250 - 1,000 m³/day High-RecoveryModular scalability
Delivery Timeline~22 WeeksFactory dispatch
Process IntegrationPre-tested Plug & PlayStandardized skids
Target AssetPetrochemical Refineries, Coal-to-Chemicals, Textile Dyeing & Battery ManufacturingCustomized baseline

view_moduleIncluded Modular Process Skids (4)

Fully skid-mounted and pre-piped in ISO containers
01

High-Pressure Disc Tube RO Skid (120 bar)

Factory integrated skid assembly (Stage 01) with instrumentation & PLC controls

checkFAT Tested in Factory
02

Titanium MVR Falling Film Evaporator

Factory integrated skid assembly (Stage 02) with instrumentation & PLC controls

checkFAT Tested in Factory
03

Forced Circulation Crystallizer

Factory integrated skid assembly (Stage 03) with instrumentation & PLC controls

checkFAT Tested in Factory
04

Salt Cake Decanter Centrifuge

Factory integrated skid assembly (Stage 04) with instrumentation & PLC controls

checkFAT Tested in Factory

constructionIncluded Turnkey Engineering & Commissioning Scope

check_circleThermodynamic Process Simulation
check_circleMaterials Corrosion Testing & Metallurgy Audit
check_circleSolid Byproduct Valorization Analysis

playlist_add_checkEngineering Design Assumptions

  • Customer supplies concrete foundation slab and raw feed water connection.
  • Customer supplies 400V / 3-phase / 50-60Hz electrical power boundary point.
  • Raw water conditions comply with specified design envelope TDS limits.

warningExplicit Battery Limit Exclusions

  • Off-site raw water intake civil structures and long-distance conveyance piping.
  • Local environmental permit filing fees (technical dossier supplied by HydroPonds).